beta
(영문) 서울중앙지방법원 2019.11.07 2018가합563085

재재보험금

Text

1. The Defendant: USD 1,332,929.20 on the Plaintiff’s currency and September 27, 2018 on the amount of USD 1,332,929 on the Plaintiff.

Reasons

Facts of recognition

A. C (C; hereinafter referred to as “C”) and D (D; hereinafter referred to as “D”) enter into an insurance contract; 1) as a joint venture investment company of the Kingdom of Brazil, C (E; hereinafter referred to as “instant construction”) around June 2014.

(2) On February 5, 2015, C entered into an insurance contract with D, an insurance company of the Kingdom of Bluenna, with the term of insurance from February 16, 2015 to November 15, 2018, with the type of insurance as a pre-risk security, property damage security ($ 658,000 in the Kingdom of Bluenna, hereinafter referred to as "Bluna"), third party liability security ($ 5,000 in each accident), third party liability security ($ 5,00 in each accident), insurance terms and conditions as German construction insurance standardized terms and conditions (Munhic Form) and special terms and conditions (hereinafter referred to as "sales insurance contract").

B. D concluded reinsurance contracts between D and the Plaintiff on February 17, 2015, with respect to the risks of paying the insurance proceeds of the instant insurance contract, concluded reinsurance contracts between the Plaintiff and the Plaintiff with the amount of reinsurance 95% of the original insurance proceeds, and with the terms and conditions of insurance based on German construction insurance standardized terms and conditions and customer insurance standardized terms and conditions.

C. On February 17, 2015, the Plaintiff entered into a reinsurance contract between the Plaintiff and the Defendant with respect to risks of paying the insurance proceeds of the instant reinsurance contract, with the amount of reinsurance 70% of the original insurance proceeds, and with the insurance terms and conditions covered by German construction insurance standardized terms and conditions, and customer insurance standardized terms and conditions. D.

On December 5, 2017, the occurrence of insurance accidents, insurance proceeds, and re-insurance proceeds (1) of the instant construction site, and the bridge pole Nos. 182 through 204 (hereinafter referred to as the “instant pole”) is located in a bridge pole located at the construction site of this case, which was marked by three bridges who were anchored at the lower reaches of the F zone, which is the vicinity of the instant construction site.

(e).