beta
(영문) 청주지방법원 2015.07.15 2015가단8353

건물명도 등

Text

1. The defendant is against the plaintiff (appointed party) and the appointed party C:

(a) a reinforced concrete structure in substantial Cheongju-si D.

Reasons

1. Indication of a claim: It is as shown in the grounds for the claim, and the attached building in the description of the grounds for the claim shall be the third floor of 123.48 square meters among the three-story detached houses of the Cheongju-gu D concrete structure (framed) concrete branch roof in the Cheongju-si.

2. Judgment without holding any pleadings (Articles 208 (3) 1 and 257 of the Civil Procedure Act);