beta
(영문) 서울중앙지방법원 2018.01.26 2015가합575223

특허권의침해금지 및 손해배상(지)

Text

1. The Defendant shall produce, use, transfer, lease “pit pumps and systems” listed in the separate sheet.

Reasons

1. Facts of recognition;

A. The Plaintiffs’ patented invention is the patent holder of the following patented invention (hereinafter “instant patented invention”). On April 8, 2015, Plaintiff A completed partial transfer registration of the right to the instant patented invention to Plaintiff DasungS Co., Ltd. (hereinafter “Plaintiff DasungS”), a company that engages in the business of leasing and selling construction materials, etc. on April 8, 2015.

Accordingly, the Plaintiffs currently share the patent right of the patented invention of this case.

1) Title: C-pit pump structure with a height of the 2 to 3rd floor of a building: Shall be combined with a structure for a structural foundation after the first assembly of the structural foundation and a c-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-p-