(영문) 대전지방법원 2018.05.24 2017고정1487

재물손괴등

Text

The defendant shall be innocent.

Reasons

1. The Defendant is the actual owner of a building located in Daejeon Dong-gu, Daejeon, and the victim D is the lessee who operates the unclaimed house in the building.

The Defendant expressed that the victim and the window of the front room inside the front room of the U.S. as a panel could not be ventilated by the panel, and that the victim expressed the part of brooms on the left upper part of the drawing on the surface of the 51 pages of the investigation record as a beauty art apparatus and septic tank, septic tank, brick storage, and garbage storage, which were used by the victim as a garbage warehouse. The Defendant stated that the victim was prepared by the victim of the drawing.

“A notice to remove” was given.

A. On July 22, 2017, the Defendant invadedd a structure, which was removed from the upper source above the lower source, and intruded into the structure managed by the victim by opening the locks adjacent to the lower source.

B. (1) The Defendant, at the same time and at the same place as above (A) above, removed the locks that the victim corrected on the side of the above U.S. source in an unlocked manner, and damaged the locks equivalent to KRW 5,000 in the market price owned by the victim.

B. The Defendant destroyed the property of the victim by failing to install any device even at the time of the removal of the locked warehouse by destroying locks as referred to in the above paragraph (a) at the same time, at the same time, at the same place as above, and removing the roof of the said brick warehouse, and thereby making it impossible for the victim to use three cosmetics equivalent to the total market value of the 900,000 won in the annual warehouse.

2. According to the records, around July 4, 2017, the Defendant was notified by the competent authority of the removal of a building in violation of the part concerning the warehouse of the first floor, which was extended without permission from the competent authority upon the victim’s report, and the removal of the roof of the brick warehouse part, which was prevented from being a panel for reinstatement, from July 22, 2017 (to July 23, 2017) to July 23, 2017.