(영문) 창원지방법원 2016.08.31 2014가합6442

손해배상(기)

Text

1. The Defendants jointly share KRW 5,583,200 with respect to the Plaintiff and the period from December 12, 2014 to August 31, 2016.

Reasons

Basic Facts

The status of the parties has operated the “C” that processes and supplies precise small machinery parts at the place of business located in Seongbuk-gu, Changwon-si (hereinafter “instant place of business”).

Defendant AWn Co., Ltd (hereinafter “Defendant AW”), Defendant AW Co., Ltd. (hereinafter “Defendant P&C”), and Defendant P&C Co., Ltd. (hereinafter “Defendant P&C”) jointly performed the instant construction work at Sungwon-gu, Sungwon-si D (hereinafter “instant construction work”). Defendant A&D Co., Ltd (hereinafter “Defendant A&D”) contracted the instant construction work from the said Defendants.

In the course of the construction of the instant construction project, Defendant AlWnn, and the Geong Fast for the instant construction project, he he he he he he he he he he he he he he he he he he he he he he he he he stored a embankment exceeding 10 meters in height (hereinafter referred to as the “instant embankment”) from the ground and constructed a road on the retaining wall. As a result, Defendant mobilization construction performed the instant construction project.

On August 25, 2014, the daily rainfall 264.5m (the maximum rainfall 83.5m per hour) in the Changwon area was accumulated, and the temporary multiple system installed in E ceases to exist, and there was an accident of inundationing into neighboring factories, including the workplace of this case.

The defendant mobilization construction carried out the business site of this case in order to clean up soil sugars.

On August 26, 2014, the Changwon-si sent an official door to the contents that Defendant AWnnnb would restore the facilities damaged by the said accident to the scarcity, provide compensation for nearby damaged factories, and maintain the drainage way in preparation for the predicted wells, and establish and submit the plan.

However, at around 23:00 on the same day, there was an accident in which soil is circulated in the neighboring factory again due to a small rain.

On August 27, 2014, the Changwon-si issued an order to suspend the construction of Albnb, and requested the examination of the safety of the stable.

In addition, September 3, 2014.