beta
(영문) 전주지방법원 2015.02.13 2014가합1255

간접공사비

Text

1. The plaintiff's claim is dismissed.

2. The costs of lawsuit shall be borne by the Plaintiff.

Reasons

1. Basic facts

A. On May 15, 2009, the Defendant entered into a contract with the Plaintiff and the instant construction amounting to KRW 13,212,510,000 with regard to the construction period from June 12, 2009 to June 11, 2012 (hereinafter “instant contract”). The Defendant entered into a contract with the Plaintiff for construction period from June 12, 2009 to June 11, 2012, to develop the innovation city for the Jeonju-ri and Jeonju (hereinafter “instant construction”).

B. The Plaintiff and the Defendant concluded on 7.7. 20 : 0. 20 : 30 ; 20 ; 3. 20 ; 20 ; 30 ; 4. 20 ; 20 ; 3. 40 ; 20 ; 3. 20 ; 40 ; 20 ; 41 ; 20 ; 20 ; 41 ; 3. 30 ; 20 ; 4. 20 ; 20 ; 20 ; 3. 40 ; 3. 15 ; 204 ; 20 ; 3. 46. 20 ; 201 ; 3. 14. 36. 20 ; 205 ; 2014. 31, 2015 ;