소유권이전등기
1. The Defendant, at the time of innju, c 713 square meters and the above ground reinforced concrete structure (refinite concrete roof) are two floors.
1. The owners (including the Defendant) of F 31 square meters, G 367 square meters, and H 8,134 square meters of land (hereinafter “instant electric source housing site”) prior to the division of the fact that the recognition was completed by the Defendant (including the Defendant at the time the representative director is the Defendant’s husband J and hereinafter “I”) in order for the Defendant to develop the instant electric source housing site and to carry out the business of constructing and selling the housing on the said ground (hereinafter “instant business”). The authority to dispose of the instant electric source housing site was delegated to I, to I, so that it can be delegated to I the authority to dispose of the instant electric source housing site.
I completed part of the site of the instant electric power resource in the instant case by constructing a single unit of the said site, and completed the sale of the said site by K (Representative L Co., Ltd.), M, the actual operator of K and the representative of the site of the instant electric power resource in August 2012, and the Defendant, who is a prop representative of the site of the instant electric power resource in the instant case, entered into an agreement on the instant electric power resource housing site and housing sale business (land price: KRW 650,00 per square year, business period: from August 15, 2012 to August 15, 2013, I shared the duties of supplying land, such as K, M, civil engineering, construction, sale in lots, etc., and shared the progress of the project in the name of K, M, and profits calculated as KRW 650,00 per square year among the profits from the instant electric power resource in the instant case, and continued the project in the instant case with K and M other profits acquired by the Defendant).
(C) Around October 10, 2012, the Plaintiff is either K and M with the authority to dispose of all the matters related to the instant project, including the development and sale of the site for the instant electric source. On or around October 10, 2012, the Plaintiff is either K and the Kunsan-siO land, building (hereinafter “Gunsan-si real estate”) and the Plaintiff.