산업안전보건법위반등
1. Defendant A shall be punished by imprisonment with prison labor for one year and six months;
However, the above punishment shall be imposed for three years from the date this judgment becomes final and conclusive.
Punishment of the crime
[Status of Defendant F Co., Ltd. [former G Co., Ltd.] is a general construction company that has removed the Jongno-gu Seoul Metropolitan Government H hotel (the 11th floor above the ground and the 3rd floor below the ground) and is a business owner who newly constructs "I hotel (the 16th floor above the ground and the 3rd underground floor)" and Defendant B is a construction company and manages safety and health while managing and supervising all affairs in the construction site as a field director of the above F Co., Ltd.
Defendant
As the building demolition company, the building demolition company is the business owner who has been awarded a contract for the removal project of the H hotel by the F M&A, and the defendant A is the representative director of the F&A and has overall control over safety and health management in the removal site, and the defendant C and the defendant D serve as the chief director of the F&A and manage the safety and health management in the removal site while managing and supervising all the affairs of the removal site.
【Criminal Facts】
1. Defendants A, B, C, and D were engaged in the work of removing H hotel from October 12, 2016 at the above site. However, according to the structural safety review report (the structural safety removal plan for existing buildings) and the decommissioning work plan, 18 units must be installed on the second floor below the removal floor, and 18 units must be used for dismantling equipment, 06LC (weight 14.5t) and 3. The removal remaining materials should be stored at the Han-gun and immediately removed, and the Defendants had a duty of care to safely perform the work by complying with the procedures set out in the structural safety review and the decommissioning work plan.
Nevertheless, in relation to the installation of jack Sack for the first floor above the ground, Defendant A may withstanding that “I will collapse inside and outside of the installation, I will find out whether the internal experts are inside, and the removal company will be responsible for the removal company,” and may withstanding down to the first floor above the ground.