beta
(영문) 춘천지방법원원주지원 2014.10.14 2014가단2074

손해배상(자)

Text

1. The plaintiff's claim is dismissed.

2. The costs of lawsuit shall be borne by the Plaintiff.

Reasons

1. Basic facts

A. B, including the conclusion of an insurance contract, concluded an automobile insurance contract with the Defendant (hereinafter “instant insurance contract”) on April 2012, and the content relating to the instant case is as follows.

On the other hand, the plaintiff is a public official of the Ministry of National Defense.

(i) Insured: A special-purpose agreement entered into between husband and wife, between 43 and 3), and C: A leisure (hereinafter referred to as “Plaintiff vehicle”);

4) Subscription security/compensation limit: The insurance period of up to 50 million won for an injury by a motor vehicle (which shall be based on special terms and conditions expanding the compensation for an injury caused by an accident that occurred in the course of operating the insured motor vehicle), the injury of which is 30 million won: from April 7, 2012 to April 24:00 to April 7, 2013:

B. On January 20, 2013, at around 16:30 on January 20, 2013, the Plaintiff: (a) driven the Plaintiff’s vehicle and tried to avoid a large amount of fire that is coming from the direction of the road near the new rupture of the original city; and (b) caused an accident of minor damage to the fronter on the right side of the vehicle by shocking the road protection wall on the right side.

(hereinafter referred to as “instant accident.” The degree of damage caused by an accident is as shown in the attached Form 3.

After the accident of this case, the Plaintiff was hospitalized as follows, and the Defendant guaranteed the Plaintiff to pay part of the medical expenses and other medical expenses for outpatient treatment, and paid the medical expenses of KRW 6,238,270 as insurance money. The payment guarantee for other medical expenses was suspended.

1) From January 21, 2013 to March 4, 2013: From D branch to D branch, 2013 to March 3, 2013: From March 11, 2013, to April 3, 2013, 2013: (a) by the oriental medical hospital affiliated with the Superior University, the salt and tension of drilling; (b) other shouldered land and power lines of the said parts; (c) other damage to the surrounding land and power lines of the said parts; and (d) other damage to the unknown details and details of hospitalization from April 16, 2013 to June 15, 2013: