손해배상(기)
1. The Defendant: (a) KRW 11,133,142 to Plaintiff A; and (b) KRW 9,118,935 to Plaintiff B; and (c) from June 11, 2013 to November 30, 2016 to Plaintiff B.
1. Occurrence of liability for damages;
A. 1) The facts of recognition have been established in a certain area of a tideland, and a politically demarcated fishery business is established to capture fish that moves along the flow of tidal currents arising from the passage of tidal currents. 2) The plaintiff A extended the permission for a sloping fishery from January 18, 191 to the reinforcement of the permission from January 30, 209 to January 29, 201, and 150 meters in the length of fishing net and 0.44 mar in the area of the sloping-gun E with the permission from the south of the Republic of Korea, the national fishing port located in the Ma of the Mando to the straight line of 1,800 meters away from the south of the breakwater of the Mando to the straight line of Mando.
3) From July 7, 2006, Plaintiff B took over the fishery right from G and engaged in the liver network fishing. From October 30, 2007 to October 29, 2012, Plaintiff B obtained permission from F to 150 meters in a straight line from F to 300 meters in a straight line, and 0.11 square meters in a water surface area. From October 30 to October 29, 2012, Plaintiff B obtained permission for 150 meters in length from G to October 29, 2017, Plaintiff B entered into a 150-meter 4 meters in a dry net fishing area from the 4th anniversary of the commencement of the construction work to the 4th of the construction work to the 4th of the construction work before and after the commencement of the construction work to the 4th of the construction work to the 7th of the 20-year fishing area from the 5th of the construction work to the 4th of the construction work to the 4th of the Ministry of Oceans and Fisheries.
5 The defendant commenced the construction of this case on July 9, 2007 and constructed a breakwater with a length of 120 meters from October 29, 2007 to November 28, 2009 and a height of 8 meters from September 24, 2009.