beta
(영문) 대전지방법원 서산지원 2018.07.10 2018가단52292

건물명도(인도)

Text

1. The defendant shall be the plaintiff.

(a) Appendix B, C, and D, of the steel pipe splate splates constructed on the land of Seosan City, B, C, and D;

Reasons

1. The description of the grounds for the claim shall be as specified in the attached Form;

2. Judgment without holding any pleadings (Articles 208 (3) 1 and 257 of the Civil Procedure Act);