(영문) 서울중앙지방법원 2016.11.18 2015가합551081

손해배상

Text

1. The Defendants jointly share KRW 60,000,000 to the Plaintiff and Defendant C with respect thereto from August 17, 2016, and Defendant B.

Reasons

1. Basic facts

A. The status of the parties is a juristic person whose purpose is to produce symbolic sculptures, etc., Defendant B is a person who worked from January 24, 2007 to July 25, 2014, and Defendant C is a person who operates “D” in a personal business entity producing sculptures, etc.

B. At around December 2012, the Guang-si received a proposal containing the attached Form 1 (F) design in relation to the public offering of symbolic sculptures from the Plaintiff’s side, and selected the design as the winning in the election (hereinafter “Wang-si”).

(2) On March 14, 2013, the Plaintiff submitted a proposal containing the design of attached Form 2 in relation to the production of the G symbol type in front of G, which was elected on March 19, 2013, and completed the production and installation of the relevant sculpture (see attached Form 2) around July 15, 2013.

(C) Around June 18, 2013, H prepared an application for deliberation on a plan for the installation of art works and the installation of the art works and the installation of the art works and the installation of the art works and the installation of the art works and the installation of the art works and the installation of the art works and the installation of the works and the installation of the works and the installation of the works and the installation of the works and the installation of the works and the installation of the works and the installation of the facilities and the installation of the facilities and the installation of the facilities and the installation of the facilities and the installation of the facilities and the installation of the facilities and the installation of the facilities and the installation of the facilities and the installation of the facilities and the installation of the facilities and the installation of the facilities and the installation of the facilities

(C) Around May 12, 2013, the Chungcheong Regional Procurement Service issued a public notice of the estimated price at KRW 258,181,818 with regard to the production of symbolic sculptures, and the deadline for the completion of the electronic bidding document at June 12, 2013, respectively, by setting the deadline for the conclusion of the bidding. Defendant C participated in the bidding as set forth in attached Table 4, and completed the production and installation of the sculpture around December 22, 2013, after being awarded the bid.

(hereinafter referred to as “M sculptures”). The 2 postal service procurement business office determines the time limit for receipt of subscriptions in relation to the production and installation of art works of Seoul NN on May 24, 2013.