beta
(영문) 광주지방법원 2018.01.05 2017가단508999

용역비

Text

1. The Defendant’s KRW 189,363,00 for the Plaintiff and KRW 6% per annum from April 18, 2017 to January 5, 2018.

Reasons

Facts of recognition

The Plaintiff is a company engaging in landscaping design and construction business of landscaping facilities, etc., and the Defendant entered into a service contract (hereinafter referred to as “first service contract”) with the Defendant (contractor) on April 11, 2014 with respect to “working design services for riparian ecological belt creation work” in relation to “working design services for riparian ecological belt construction work” in 2014 between the Defendant (contractor) and the Jeoncheon-si.

(A) The title of services under the agreement on the support of human resources: The contract amount: 8,94,00 won (including value-added tax) from April 11, 2014 to September 10, 2014: The defendant (Seo integrated Construction Corporation): The defendant (Seo integrated Construction Corporation): the plaintiff (Seo integrated Construction Corporation): - omitted-3 (Commencement of Professional Design Office) - Article 3 (Commencement of Engineering Project) ① The period of delivery and the results of the work shall be specified within the scope of the task to be performed by the "B".

(2) After the conclusion of the contract between “A”, “B” shall without delay prepare an engineering process schedule and a calculation sheet and obtain approval from “A”.

Article 7 (Inspection) (1) "B" shall complete the engineering project, notify "A" of such fact, and at the time of requesting an inspection, "A" shall notify "B" of the results of the inspection within 10 days, and if the notification is not made within this period, the inspection shall be deemed to have passed.

(2) If the result of the inspection of the “A” as referred to in the preceding paragraph raises an objection, the “B” may request a reinspection.

(3) Paragraph (1) shall also apply where a person wishes to receive all or part of the price for the completed portion before the completion.

Article 8 (Acceptance) "A" shall confirm the completion of an inspection referred to in Article 7 and, if there is a request for acceptance of "B", take over the relevant object immediately.

Article 9 (Payment of Price) (1) "B" shall complete an object and be prescribed.