beta
(영문) 인천지방법원부천지원 2017.05.12 2016가단7175

공사대금

Text

1. The Defendant’s KRW 62,912,60 for the Plaintiff and 6% per annum from April 19, 2016 to May 12, 2017.

Reasons

1. Facts of recognition;

A. The Plaintiff entered into a construction contract (hereinafter “instant construction contract”) with the Defendant in early 2014, which newly constructs multi-household C Dong (hereinafter “instant building”) in Gyeonggi-gun C (hereinafter “instant construction contract”) with the Defendant, the construction cost of KRW 581,00,000,000 (However, without the Plaintiff’s license for construction business, the Plaintiff entered into a contract with the contractor as the Han River Construction Industry Co., Ltd., and the subcontractor as the Plaintiff.

(2) The instant building was approved on August 18, 2014, and the registration of ownership preservation was completed in the Defendant’s name on August 27, 2014.

B. The Plaintiff and the Defendant settled the instant construction cost of KRW 62,00,000 on September 2014, 2014, on the grounds that the construction cost was increased by KRW 81,069,00 as follows, compared to the time of the instant construction contract, compared to the instant construction contract, the instant construction cost was settled as KRW 662,00,00, and the Defendant’s unpaid construction cost was KRW 175,00,000.

subsection (b) increase and decrease in the prime contract; and

1. Incidental civil engineering 1) A Dong T-dong construction owner C-dong construction work owner C-dong construction work owner 4,800,000 4,800,000 4,800,000 2,400,000 3) “2,400,000 2,400,003) C-dong complex civil engineering & removal and new construction work “8,400,000 8,400,4000 8,29,000 28,229,000 28,229,000”

2. 1) Multilateral alley project “new 15,959,00 15,959,000 15,959,000 2) Multilateral alley project” means 22,881,00 22,881,000 3) multilateral alleyproof writing (630,00) (630,000) (638,840,000) (638,840,000)

3. Total floor area of 166 square meters 17,500,000 square meters 17,500,000 square meters 3,500,000 square meters.

4,500,000 - 3,500,500,000 c. 3,569,500,5000 81,069,000

C. On January 20, 2015, “The Second Agreement” was drawn up and passed after January 20, 2015, and the Plaintiff and the Defendant included part of the 175,000,000 won of the settlement amount of the first agreement on January 20, 2015 and the said buildings under Nos. 203 and D A 202.