beta
(영문) 서울중앙지방법원 2015.07.23 2014가단5067990

구상금

Text

1. The Defendants jointly share KRW 70,153,869 with respect to the Plaintiff and 5% per annum from January 20, 2014 to July 23, 2015.

Reasons

1. Basic facts

A. The Plaintiff is an insurer who entered into an automobile comprehensive insurance contract with respect to A rocketing car (hereinafter “Insurance Vehicle”).

(2) The Defendants are contractors performing construction works by receiving a supply of and demand for the C Development Project (hereinafter “instant construction”) undertaken in Jung-gu, Incheon from the Korea Land Corporation and the Incheon Urban Development Corporation.

B. On October 9, 201, D around 4:45, 201, the instant accident (1) driven an insured vehicle with an insurable vehicle carrying friendships E, F, G, and H in the influence of alcohol level of 0.134% at a alcohol level, and led them to the front of the construction site of the instant case.

The front of the construction site is a three-distance intersection, where the left or right-hand turn can only be made, and the straight line could not be made. However, the Defendants opened a temporary straight line in order to enter the construction site and changed it to a private-distance intersection, and the signal signal was installed with four-dimensional signal signals added.

(2) D entered a construction site without regard to a construction site in the front section, and the boundary adjacent to the Sejong-wheeled Facility was shocked, while failing to operate the brake properly and proceeding to the end of the construction site, and the insured vehicle was cut down on the open-to-door convenience duct at the end of the construction site, and then the insured vehicle was dissatisd and was dissatisd.

(hereinafter “instant accident”). The instant accident suffered serious injury, F, G, and H, the winners of the instant accident, and E died.

(3) At the instant construction site, three speeds are only installed, and there was no facility for inducing the passage of vehicles, or no facility for launching a road or surface to inform that the construction site is a facility for controlling vehicle access.

C. The Plaintiff’s payment of insurance proceeds is an agreed amount or a medical fee under an insurance contract, and the bereaved family members of the network E from December 21, 201 to January 20, 2012.