1. Of the instant lawsuit, the Defendant’s entry in attached Form 1 against the Plaintiff as Decision No. 2014-203, Sept. 17, 2014.

Reasons

Basic Facts

Modern Construction Co., Ltd. (hereinafter referred to as “Modern Construction Co., Ltd.” in the name of all the companies; hereinafter referred to as “Co., Ltd.”) status of the Plaintiff, etc. and the process of its disposition, treatment construction, Samsung T&T construction, Samsung C&S construction, z. construction, z. and Modern Industrial Development (hereinafter collectively referred to as “seven large Construction Co., Ltd.”), Plaintiff, lotl Construction, Komba Global, Hanjin Heavy Industries, Samjin Heavy Industries, T&T construction, T&T construction, T&T construction, T&T construction, Gyeongnam-gu, T&T, T&T, T&T, T&T, T&T, Samsung Heavy Heavy, and Han (hereinafter referred to as “14 construction companies, etc.”), and the above 7 large construction companies, including the above 17 large construction companies, are defined as “14 construction companies, etc.” and “20 companies, including the above 20 major construction companies, etc.” (hereinafter referred to as “Plaintiff 261 and one company, etc.”).

Construction works for high-speed high-speed railroads with the outline of the construction works for high-speed high-speed railroads are construction works for construction of high-speed rail networks of 184.534 km in length, which link the transmission, factory owners, ices, small-scales, and transmissions.

The project cost of approximately KRW 8.352.9 billion has been invested as a large-scale national policy project which is promoted to form a axis of traffic and life as a large-term local network along with the low-speed high-speed rail.

New construction works for the high-speed railroads in South and North Korea were ordered by dividing it into 19 construction sections.

Of them, Section 1-1 and Section 3-2 are design and package deal projects; Section 1-2, Section 1-4, Section 2-3, and Section 4-2 were bided by alternative bid; 13 Section 13, including the remainder of Section 2-1, are referred to as “instant construction projects”; and hereinafter “the case is referred to as “the case where the bid procedure is referred.”