건물등철거
1. The defendant,
A. The ratio of KRW 846,850 and KRW 28,000 per month from October 1, 2016 to September 27, 2017 to Plaintiff A.
1. Facts of recognition;
A. On April 29, 200, Plaintiff A completed the registration of ownership transfer with respect to the land listed in paragraph (1) of [Attachment List No. 1] (hereinafter “No. 1”), and each registration of ownership transfer with respect to the land listed in Annex No. 4 (hereinafter “No. 4”) on May 4, 2004.
B. On November 18, 2015, Plaintiff B completed each registration of ownership transfer with respect to the land listed in [Attachment 2] Paragraph (2) of [Attachment 2] on November 6, 2014, as to the land listed in [Attachment 3] Paragraph (3) of [Attachment 3] on November 6, 2014 (hereinafter “third land”; and the combination of land 1 through 4 “each of the instant land”).
C. From January 2, 2014 to September 27, 2017, and from September 28, 2017, the Defendant’s Intervenor taking over the instant land (hereinafter “acquisition Intervenor”) owned and used part of each of the instant land as a site for a building adjacent to a neighboring building or a facility connected to a neighboring building, etc., as follows.
1) Part 5 square meters inboard (i) connected in sequence with each point of Annex 1, 2, 3, 4, and 1 among the land in Annex 1 (A) of the attached Form No. 1 (hereinafter “section 1 of the land”).
[] : 2) Part 7 square meters in part (b) in part (b) in the ship connected with each point in sequence of 7, 8, 28, 27, 26, 25, and 7 of the annexed Form (2) among the land in subparagraph 1 (b) of the attached Form (hereinafter “part (b) of the land in subparagraph 1”) among the land in subparagraph 1: Part 18 square meters in the attached Form (c) among the land in which the land in subparagraph 2 of the attached Form (3) is occupied and used as the site for the facilities, such as gas pipes connected with the adjacent building, air conditioners, etc., connected with each point of 4, 6, 7, 8, 9, 10, and 4 in sequence (hereinafter “part (c) of the land in subparagraph 2”).
[4] Possession and use as a site for an adjacent building: Attached Form No. 9, 10, 10, 20, 11, 12, 13, 14, 15, 16, 17, 18, 19, and 9 are attached Form No. 2 of the land of the neighboring building, and approximately 32 square meters (hereinafter “(v) area inboard (e) part (e) of the land): The land occupied and used as a site for a squad consisting of trees, gardenstones, etc. connected to the adjacent building in sequence.