특정범죄가중처벌등에관한법률위반(도주치상)등
Defendant shall be punished by a fine of KRW 7,000,000.
When the defendant does not pay the above fine, 100,000 won.
Punishment of the crime
The Defendant is a person who is engaged in driving of CK5 cars owned by Korea-Seaea City.
On July 13, 2016, the Defendant driven the above vehicle on July 10:15, 2016, and proceeded at a speed of about 88.9km - 91.8km at a speed of about 88.km to the front side of the veterans center in Seo-gu, Seo-gu, Seo-gu, Gwangju, Seo-gu, Seoul, along one lane from the port of convention to the port of incineration.
At the same time, the speed limit is 60km/h/h at the time, and the first lane is a point where it is possible to turn straight to the right left, and the vehicle that is straight down at the later side of the two lanes at the time was in progress, so there was a duty of care to reduce the speed prior to the entry into the intersection, keep the lane, and prevent the accident by driving safely while complying with the speed limit.
Nevertheless, the Defendant neglected to do so, while driving rapidly more than 28.9km to speed a speed of 28.9km to speed a limit, or more than 31.8km to speed a straight line on the opposite side, and changed the course to the one lane beyond the stop line in order to speed a straight line, and the victim F, who was driven by the victim F, who was driven by the victim F, going ahead from the two-lanes in the same direction to avoid a collision with the Defendant’s driving vehicle, did not move to the right side and did not move to the right side of the vehicle, and got off the signal pole by breaking the signal pole to the right side, and turned to the ordinary civic park.
As a result, the Defendant, by such occupational negligence, sustained injury to the above victim by blood transfusions, etc. under the influence of an open room in the head requiring approximately six weeks medical treatment, and at the same time, destroyed the above K5 car so that approximately KRW 16,574,435 repair cost, such as Litter exchange, etc., may be damaged and construction cost is approximately KRW 1,584,00.