추심금
1. The Defendant’s KRW 90,000,000 as well as annual 6% from September 4, 2014 to December 1, 2015 to the Plaintiff.
Basic Facts
On October 31, 2012, C and D, which operate a contract for the removal construction work and the construction and removal of scrap metal, prepared the following contracts with the Defendant’s office for the removal of part of “F hotel” on the ground outside E and 8 lots of “F hotel” (hereinafter “instant removal construction”) from the Defendant. At the time, G, working as the head of the Defendant’s on-site office, put their seals on the Defendant’s trade name and side of the instant removal construction contract using the Defendant’s corporate seal at the time.
[This case's removal construction contract] Defendant, C, and D enter into a contract for removal of buildings as follows:
(1) The name of the project: The name of the project: the area of the E and 8 parcels outside of the city of Ansan-si: the removal period: E and 8 parcels outside of the city of Ansan-si: the removal period: (a) the (public disturbance) date of September 2012 through (public disturbance) January 2012; (b) the removal cost of January 4, 201: KRW 400,000 (Partial removal).
1. C and D shall take charge of all removal and removal of the facilities and buildings set forth by the Defendant for two parcels, E, and in the case of Osan City.
Article 6 (Guarantee Money) C and D shall deposit % of the cost of removal with the Defendant as the performance bond within (public space) days from the conclusion of the contract for the removal of this case, and the Defendant shall refund it to C and D at the same time as the payment of the balance is made.
Provided, That when C or D fails to perform the construction works or when there is a defect in the construction works, the defendant may apply the warranty bond to compensate for the damage when the relevant damage occurs.
Article 15 (Matters of Special Agreement) In addition to the general matters of the above contract, the following matters shall be determined by the special agreement, and if the special agreement conflicts with the main sentence, the special agreement shall prevail over others:
In addition, at the time of the preparation of the contract for the removal of this case, C shall purchase the scrap metal from the site of the removal of this case between G and G in KRW 90,000,000, and the purchase price shall be the deposit account in the name of G as stipulated in Article 15 of the contract for the removal of this case.