배임증재
Defendant
A shall be punished by imprisonment with prison labor for ten months, and imprisonment with prison labor for six months.
However, this decision is delivered to the Defendants.
Punishment of the crime
Defendant
A is the representative of E, who is the main business of the power generation business, and the defendant Eul is the person who works as a director in charge of the business of the above corporation E.
F is the representative of G Co., Ltd. producing power generation facility boiler temperature control center parts, etc., H H is the Han Heavy Industries Co., Ltd. producing industrial boiler, heat exchangeers, heating lines, etc., the K Team vice head of the two mountain Heavy Industries Co., Ltd. constructing chemical power plants, L is the director of the two mountain Heavy Industries Co., Ltd. constructing a composite thermal power plant, the two mountain Construction M Team head of N, the N is the vice-director of the above two mountain Construction Team, and theO is the above two mountain Construction Team vice-director.
1. Defendant A
A. Around March 2012, the Defendant made a solicitation to the F Company F to the effect that “E may continue to be able to be able to be provided with a monopoly at a lower price than the arm’s length price when he is supplied with the part of the temperature control center from G” in relation to the G G’s total right to buy the power generation facility boiler boiler at the office located in Seongbuk-gu Q Buildings, Sungwon-si, Changwon-si, Seoul. In addition, the Defendant transferred a total of KRW 201,000,000 to the S account used by F through the R account, as described in the attached list of crimes, and granted KRW 201,00,000 to the F’s duty to handle the business affairs, etc. of G companies, along with an unlawful solicitation.
B. The Defendant granted to Han Heavy Industries H around February 10, 201, transferred KRW 2,00,000 to the account in the name of the above H, along with an unlawful solicitation, such as “supply of supply-related convenience and continuous transactional maintenance,” to the Han Heavy Industries H, which supplies boiler production parts at the office located in Sungwon-si, Sungwon-si, Seoul Special Metropolitan City, as well as KRW 2,50,000,000 on April 1, 2010, around July 20, 2010; and KRW 2,50,000,000 on or around July 20, 2010; around September 13, 2010; and around January 25, 2011.