1. Details of the disposition;

A. The Plaintiff’s labor relationship 1) The Plaintiff is a stock company B (hereinafter “instant company”) from June 7, 2010 to March 31, 2017.

(2) The Plaintiff’s working hours and working forms, and the specific details of the work carried out by the instant company, as well as the methods for carrying out them, are as follows:

Working hours: 08:30 to 17:30 (8 hours); 08:30 to 20: 30 hours of overtime work: 40 minutes (12:10 to 12:50); 30 minutes (18:10 to 18:40); 40 minutes of rest hours (10:10 to 10:30, 15:10 to 15:30). The content and method of the work classified and the method of the work of manufacturing products. The semi-finished goods are installed in the margin, and the work of a sex is divided by dividing them.

The gender-type time is 50 minutes at one time, and the liquidation money for the products whose gender has already been completed during the gender-type period and the preparation of the following semi-finished products shall be conducted.

After completion of sex, the following work shall be cleaned at the top or upper of the sunset frame, and approximately one minute per time shall be spent.

The average number of working days per day is 400 times.

It shall be carried out in the future after being able to examine whether or not the products completed by the studal of the studal inspection process are defective.

8 copies at the time of a single inspection shall be inspected, average 5 minutes shall be required, and 8 times a day shall be conducted.

The material transport work shall be transported at a place where the material is stored to approximately 25 meters wide from a place where the material is stored.

The materials shall, as they are loaded on the upper or lower level or below, be transferred to the mobile lending and borrowing by citing materials which are influence, and shall be moved to the lending and borrowing after being loaded.

The weight of materials is 10-15 km and work eight times a day.

B. On September 25, 2017, the Plaintiff applied for medical care benefits and the Defendant’s non-approval disposition 1 Plaintiff generated each of the following: (a) the escape symptoms of conical signboards between the 6,7, and the 4, and the 5th conical signboards by performing the work that is borne by the background and conical trends in the instant company.