beta
(영문) 서울고등법원 2017.10.26 2017나2003862

손해배상(기)

Text

1. The plaintiff's appeal is dismissed.

2. The costs of appeal shall be borne by the Plaintiff.

Purport of claim and appeal

The first instance court.

Reasons

1. Basic facts

A. On March 8, 2011, the Plaintiff acquired land ownership and newly built a building (hereinafter “B interest”)

() On April 20, 201, the ownership of C road 7 square meters and D large 62 square meters, and on April 20, 201, the ownership of E large 480 square meters, F large 533 square meters, G road 377 square meters, G road 1,070 square meters prior to H, I, 386 square meters prior to J, 200 square meters, and K forest 672 square meters, respectively. The said nine lots of land (hereinafter collectively referred to as “each of the instant land”).

(2) On March 24, 201, the Plaintiff acquired each development activity (land form and quality alteration) for the purpose of building a detached house or a tenement house and building a site for an access road (land form and quality alteration) from the head of an reinforcement Gun with respect to a total of 910 square meters of F and G size on March 21, 201, with respect to a total of 495 square meters of H and J size on March 21, 2012, and a total of 485 square meters of H and H size on May 2, 2012.

3) On May 12, 2012, the Plaintiff: (a) on the E and D ground, the reinforced concrete structure machine, roof single-story house, 95.49 square meters of reinforced concrete structure, 95.49 square meters of detached housing on the F ground (in sequence, hereinafter “instant 1 housing”; and (b) the “instant 2 housing”; and (c) on the instant housing collectively, each of the instant housing units.

On October 4, 2012, each of the instant housing units was newly built and obtained approval for the use of each of the instant housing units. On the other hand, the instant housing site is about 17 meters. (B) On December 29, 2011, the head of the strengthening Gun issued a public notice on the determination of an urban management plan (sports facilities: sports facilities) that newly constructs public cultural and sports facilities on the 115,386 square meters of the Incheon Reinforcement-gun Muri (hereinafter “Mri”)’s Duri on December 29, 201, the head of the Gun changed the project area into 118,086 square meters due to the creation of a large storage site, the security of a large-scale storage site, the location of the camping field (a auxiliary practice site), etc. on June 28, 2013.

2) The Defendant shall create Nwon L (hereinafter “instant development project”).

A business operator who is a business operator with approximately 86,413 square meters of two zones (as a business operator with approximately 86,413 square meters) around September 28, 2012