(영문) 서울중앙지방법원 2015.01.22 2013가합86613

손해배상(기)

Text

1. Defendant D and E shall each of the plaintiffs A 40,911,579 won, the plaintiff B and C respectively, and their respective amount of KRW 1,00,000,000 and each of them on October 9, 2013.

Reasons

. Next, while putting a forest belt installed outside of the windows set forth in the above 303, the window 203, which is the next floor, was cut down on the ground and falling down on the ground, and suffered from the pelle of the credit wave strings, the pelle of the external strings, the pelle of the external strings, the pelle of the external strings, the external pelle of the external strings, the pelle of both sidess, and the pelle of the closed pelles, etc. (hereinafter “the instant injury”).

C. On October 9, 2013, Gangnam Fire Station arrived at the fire site of this case from around 00:45 to 02:00 on October 9, 2013, and conducted the first investigation. On the same day to around 09:00 to around 13:00 on the same day, the second investigation was conducted in collaboration with related agencies at around 09:0 to 13:00 on October 14, 109 to 13:00 on the same year. Gangnam Fire Station conducted the fire investigation of this case. The Gangnam Fire Station conducted the fire investigation of this case; V. Fire Station of this case and the point of determination of the cause of fire distribution on the wall of the parking lot of the first floor: Electric factors (the ground for determination of the point of origin of the non-verification and the point of determination on the cause of fire distribution on the wall of the first floor:

1. Statement of the person concerned;

A. According to witness**** (Nam and 61year birth), neighboring housing J*********, and the first half of the first half of the first half of the first half of the second half of the second half of the second half of the second half of the second half of the second half of the second half of the second half of the second half of the second half of the second half of the second half of the second half of the second half of the year of the second half of the year.

At the time of arrival of the front line (former 119 Safety Center) the instant multi-household electric poles adjacent to the multi-household of this case, flames and sprinks were put in a sprink and sprinks, and at the wall of the first floor parking lot, flames and sprinks were turned out.

2. Status of the placement and burning of combustible materials;

A. The subject of the above is a multi-household house (studio-type) with the entrance and wall of the entrance to the entrance and wall of the entrance for the purpose of the parking lot, and the distribution of this case was installed.

B. As the red-power meter and power circuit breaker installed on the wall of this case installed on the wall of this case have been destroyed, it appears that the flame and sprinker have been cut out to the outside of a house;

A. The case is established on the wall of the first floor parking lot.