beta
(영문) 제주지방법원 2016.08.04 2014가단1637

토지인도

Text

1. The Defendants jointly do so to the Plaintiffs:

A. An outcome map of the cadastral status survey in the attached Form No. 125 square meters in Seogpo-si, Seopopo-si.

Reasons

The Plaintiffs, on September 17, 2009, purchased H 125 square meters (hereinafter “instant land”) from the I in Seogpo-si, Seopo-si, Seopo-si, Seopo-si, and completed the registration of ownership transfer on September 24, 2009 for each 1/2 shares.

이 사건 토지 중 별지 지적현황측량 성과도면 표시 ㄱ, ㄴ, ㄷ, ㄹ, ㄱ의 각 점을 차례로 연결한 선내 ‘가’ 부분 2㎡ 지상에는 연못이 설치되어 있고, 같은 도면 표시 ㅁ, ㅂ, ㅅ, ㅇ, ㅈ, ㅊ, ㅋ, ㅌ, ㅍ, ㅁ의 각 점을 차례로 연결한 선내 ‘나’ 부분 24㎡ 지상에는 비닐하우스가 설치되어 있다.

J established the instant land, and occupied the instant land (the Defendants did not dispute the aforementioned assertion by the Plaintiff) on July 3, 2013.

Defendant C, E, F, and G, the wife, succeeded to J.

The annual rent of the instant land calculated by the appraiser K shall be as follows:

According to the above monthly rent for the period of September 24, 200 to September 24, 2009: (a) from September 23, 2010 to September 182, 1201, 170 to September 15, 201; (b) from September 24, 201 to September 182, 170 to September 17, 201; (c) from September 24, 201 to September 24, 201 to September 23, 201 to September 23, 2011 to September 210 to September 24, 201; and (d) the Plaintiff’s overall appraisal of the land as of September 24, 201 to September 24, 201 to September 3, 2012, to the effect that the Plaintiff’s appraisal of the land as of September 24, 2013 to September 21, 2014 to 25.

Therefore, the Defendants have the duty to remove the pond and vinyl installed on the ground of the instant land, and deliver the instant land to the Plaintiff.

In addition, the Defendants acquired the ownership of the instant land from September 24, 2009 to the Plaintiffs.