beta
(영문) 창원지방법원진주지원 2017.06.23 2016가단36108

소유권이전등기

Text

1. The Defendant shall, in order to the Plaintiff, each point of the attached Form 1, 2, 3, 4, 5, and 1 among the land size of C,372 square meters in Jinju-si.

Reasons

1. Basic facts

A. In the 1980s, the Plaintiff purchased from Jinju-si E, the Defendant’s mother-child 344 square meters, f. 648 square meters in Jinju-si, and its ground and 324 square meters in G, respectively.

(hereinafter “instant sales contract”). B.

On January 23, 1984, the Plaintiff filed each registration of preservation of ownership with respect to F. F. 648 square meters and G. 324 square meters. On March 21, 1994, the Plaintiff completed the registration of transfer of ownership on the ground of sale on July 5, 1982.

C. On July 3, 1995, the Plaintiff constructed cement brick brick structure, sbroke roof housing, 96.98 square meters attached thereto, cement block structure, sbroke roof, and 69.5 square meters attached thereto (hereinafter “instant building”) on the F land in Jinju-si, and obtained approval for use on July 3, 1995, and registered the preservation of ownership on the said building on July 25, 2016.

D On September 26, 1970, on the 3,372 square meters of C forest land (hereinafter “the forest of this case”) in Jinju-si, and the Defendant, a child of D, completed the registration of ownership transfer on the ground of inheritance by agreement division with respect to the above land.

E. 1) The instant building consists of main debt(s) (A) part of the instant building consisting of the main debt(s) of the building, the prefabricated structure structure structure warehouse (the part indicated in the drawing(s) of the attached Form(s)), the Blub lub warehouse (the part indicated in the drawing(s) of the attached Form(s)), and the Blub lub warehouse (the part indicated in the attached Form(s) of the instant building). 2) The prefabricated structure warehouse of the instant building, among the forest land, is constructed by settling 3 square meters of the portion of the instant building (c) connected with each of the items indicated in the attached Form(s) 6, 7, 8, and 6 among the instant forest land, which are collectively indicated in the drawings(s) of the attached Form(s) of the instant forest land, and the warehouse of Blub lub is constructed on 12 square meters of the instant forest land connected with each point of 10,112,12,13,16,14,7.

3. Attached drawings 1, 2.2 among the forest land of this case