(영문) 서울동부지방법원 2015.08.19 2013가합14635

계약금반환 등

Text

1. The plaintiff's lawsuit against the defendant B shall be dismissed.

2. Defendant C shall pay to the Plaintiff KRW 254,412,734 and KRW 84,00,000 among them.

Reasons

Basic Facts

The content of the construction work: Mame, open of a fume, and opening of a road by drawing up to K before the village hall: 800 - Construction by drawing up 1200 - at least 2 of roads, 1200, strings, ground-breaking, cutting, cutting, covering, packing, trings, packings - removal of trees in a complex and construction of a road, construction of a complex and installation of a facility for preventing scattering dust: 5,500,000 ( September 14, 200), 10,000 ( September 20): The remaining balance of the contract amount: The plaintiff paid to the defendant B within four days after the expiration of the contract amount: F, G, H, I, J, and K for the purpose of creating a housing complex for electric power resource at the end of this City through E on September 14, 2012; and the main contents of the contract amount as at the time of the contract amount being set up as at 35 million,500,000.

E A receipt shall be issued to the company that constructs a house on the land of 180 square meters in the retaining wall construction (ground 1m, 2m above ground), road construction (o, excellent pipes, pentle construction), flat work, and 10 square meters in the end of the road, executes the construction of groundwater at the end of the road, executes the construction of groundwater at the end of 100 square meters in the total of KRW 130,000,000, and receives the remainder of the down payment as the purchase of one parcel out of the D-L lot out of the total of KRW 130,000,000 in the construction cost.

Matters of special agreement

1. The completion of retaining walls construction in the above construction shall be completed by February 28, 2013, and shall be waived all costs, such as construction costs, all materials, equipment, and personnel expenses, which have been put in public notice.

It will not raise any civil or criminal objection.

2. If a retaining wall construction is paid in 30 million won after completion of the retaining wall construction, to complete road construction works (including sewage, excellent pipes, fences) and packings, and to waive all costs, including construction costs, all materials, equipment, and personnel expenses, within seven days from that date.

It will not raise any civil or criminal objection.

3. When payment of KRW 50 million is made after completion of road works and packing, housing and completion of roads shall be made within 15 days from the date of payment.