beta
(영문) 춘천지방법원 영월지원 2012.12.07 2012고단428

특수절도

Text

Defendant

A and B Imprisonment for eight months, and each of the defendants C and D shall be punished by imprisonment for six months.

However, Defendant C and D.

Reasons

Punishment of the crime

1. On August 9, 2012, from around 22:00 to around 02:00 of the same month, Defendants A and B entered the gap inside another tunnel where the surveillance of the victim G, the site manager, H, etc., was neglected between the construction site of the national road 36 of the Gyeongjin-J in the Gyeongjin-Jan National Road Round between B and B, from around 22:00 to around 102:0 of the same month. Defendant A prepared cut the 35S Q Q cable 90, the market price of which is KRW 25,343,60, 700, the 16S Q Q Q Q cable 700, the 10S Q Q Q Q cable 700, the 10S Q Q Q wire 700 to 20 to 20, the 2010 to 300, the 2012.

2. On August 13, 2012, from around 02:30 to around 05:30 of the same day, the Defendants 152-3, a factory dormitory building owned by the victim, the Defendant, i.e., the Defendant’s special larceny, i.e., the Defendant, along with 480km of electric wires and communication lines equivalent to KRW 3,983,00, the market price of the victim’s possession, and carried them into the Defendant A-owned I truck.

3. A around August 7, 2012, Defendants C and D received a request from A to “in the case of goods to be deducted from a construction site manager and a foot, which would cause the transport of cargo lanes,” from the body of the J in the name of J operated by A in Chungcheongnam-gu, Chungcheongnam-do.

Defendants, at around 02:30 on August 9, 2012, at the construction site of the national road 25,343,60 won at the market price of the victim G Co., Ltd., at around 35S Q Q Q Q Q standard cable at around 02:30,00, 700, 16S Q Q Q standard cable at around 700, 16S Q Q standard cable at around 16:0, 700, and 10S Q Q Q standard cable at around 36,25,343,60.