손해배상(산)
1. The plaintiff's claim is dismissed.
2. The costs of lawsuit shall be borne by the Plaintiff.
1. The plaintiff asserted as the cause of the claim in this case, around 09:10 on September 17, 2012, the plaintiff, who is employee of the defendant company, had been instructed by the representative director of the defendant company to install the drainage pumps at the reclamation site, because it is the same as a typhoon," and transferred the drainage pumps to the loading box of one ton of cargo after arrival at the reclamation site of the defendant company located within the military environmental management center, the drainage pumps were moved to the loading box of the cargo, and he had the above cargo loaded to the above 6-line of the cargo loaded to the above 7-line of the cargo loaded to the above 6-line of the cargo loaded to the defendant's 6-point of the above 7-point of the above cargo loaded to the defendant's 6-point of the above 7-point of the above cargo loaded to the defendant's 6-point of the surface of the 7-day cargo loaded to the defendant's 12-day cargo loaded to the above 6-day cargo pumps, and caused the plaintiff's injury to the 112-day.