손해배상(자)
1. The Defendant: (a) against Plaintiff A, KRW 97,535,640, KRW 60, and KRW 60,023,760 for each of the said money; and (b) on April 28, 2017 for each of the said money.
1. Occurrence of liability for damages;
A. Fact-finding 1) D is the Epft Cargo (hereinafter “Defendant”) around April 28, 2017, around 05:10, around 05:10.
(ii) When the driver was negligent in leaving the front road of the vehicle at the port side of the Namyang-ri, the driver did not discover any G crossinging the crosswalk in accordance with the green pedestrian signals from the left side of the last course to the right side, did not discover any G crossinging the crosswalk in accordance with the green pedestrian signals, and did so to the front part of the Defendant’s vehicle, followed by the front part of the vehicle with the rear wheels of G head, etc. (hereinafter “instant accident”).
2) G died due to the instant accident
(3) The Plaintiff is the deceased’s spouse, and the Plaintiff B and C are the deceased’s children, and the Defendant is the insurer who entered into an automobile comprehensive insurance contract with respect to the Defendant’s vehicle (based on recognition). [In the absence of dispute, the Plaintiff 1 through 3 and 6 evidence (including part of number, the purport of the entire pleadings)
B. According to the above facts, the defendant is the insurer of the defendant vehicle, and the defendant is responsible for compensating the plaintiffs who are the deceased and their bereaved family members due to the accident of this case.
2. In addition to the matters stated below within the scope of liability for damages, each corresponding item of the Schedule of Calculation of Compensation for Damages shall be as follows, and in principle, the period for the convenience of calculation shall be calculated on a monthly basis, but less than the last month and less than KRW 1 shall be discarded.
The calculation of the current value at the time of the accident shall be based on the reduction rate of 5/12 percent per month to deduct the interim interest.
It is rejected that the parties' arguments have not been separately explained.
Personal information 1) Personal data: as stated in the “basic matters” list of the amount of damages calculated in attached Form 1: The income and operating period: Construction wage, the number of operating days was the deceased as a construction business operator on the 22th day of each month, and the deceased operated a business in the course of employing the human body as a construction business operator. The reported income in 2016 only 6.8.