(영문) 서울남부지방법원 2019.05.14 2018가단14100

손해배상

Text

1. Defendant C Co., Ltd. shall pay to the Plaintiff KRW 15,326,873 as well as its annual interest from July 18, 2018 to May 14, 2019.

Reasons

1. Basic facts

A. The Plaintiff is the owner of the Yeongdeungpo-gu Seoul Metropolitan Government multi-story Housing (hereinafter “instant building”). Defendant B owned the E large E, 110.1 square meters, F, and 113.4 square meters adjacent to the said building and trusted to G Co., Ltd., and Defendant C Co., Ltd (hereinafter “Defendant Co., Ltd”) is a company that contracted the construction of the 6th floor multi-story complex building (hereinafter “instant new building”) on the said trust land from Defendant B for construction.

B. On February 27, 2018, while the Defendant Company entered into a construction contract with Defendant B on February 27, 2018, and removed the existing building owned by Defendant B on the said trust land, the roof of the instant building was destroyed by flaging it into a blick, and a flick on the wall was destroyed by flick, and a flicker owned by the Plaintiff

C. On May 17, 2018, the Plaintiff and the Defendant Company agreed that the Defendant Company will perform repair works, such as a closed place, on the wall, until May 31, 2018, and shall pay KRW 4,000,000,00 as damages for the destruction of the misunderstanding caused by the removal of the building.

The cost of the restoration of detailed types of work (including cost) and other installation work (including cost) and 2,535,000 demolition work (excluding cost and 683,694 removal work) and 1,094,000 interior storage work (ju 1), 353,840 square removal work (excluding cost and 2), 464,00 roof glass work (excluding cost and 1,903,00 roof work) and 1,903,00 kitchen work and 321,00 kitchen work and 321,000 kitchen work for disposal of wastes, 103,000 combined work and 11,895,534 Note 1) and 694,000 joint cost and direct cost and indirect cost and indirect cost and indirect cost and indirect cost and expenses less than 35,000 won among appraisal work of appraiser I, 2,97,000 won and indirect cost and indirect cost and indirect cost and not more than 3841,21,2541,250

2) Of the appraiser I’s appraisal and painting work, the sum of material costs and direct labor costs of 87,97,97 and indirect labor costs of 53,163 shall be included in the total of design cost of 53,163.