(영문) 대구지방법원 2012.09.20 2011가합11393

손해배상(기)

Text

1. All of the plaintiff's claims are dismissed.

2. The costs of lawsuit shall be borne by the Plaintiff.

Reasons

1. Basic facts

A. The Plaintiff, a carpet selling company, is operating C, and owns a warehouse located in Gyeongcheon-si, Gyeongcheon-si (hereinafter “instant warehouse”).

On November 1, 2010, the Defendant Korea Electric Power Corporation (hereinafter “Defendant Korea Electric Power Corporation”) separated electric wires charged to the instant warehouse with electric measuring instruments connected to the instant warehouse (hereinafter “instant measuring instruments”) and sealed the instant electric measuring instruments to take measures for cutting off the instant warehouse.

B. On November 201, 2010, Defendant B, a livestock farmer in the vicinity of the instant warehouse, planned to establish a quarantine center in the vicinity of the instant warehouse, along with village residents, as a result of the outbreak of a relief station in the inside-dong area.

The village residents connect the instant measuring instrument sealed in order to draw electricity to be used at the quarantine station to the temporary electricity, connecting the instant measuring instrument installed at a height of 2 meters above the ground with the electric power source, and connecting the electric wires with the electric power circuit breaker installed immediately below the instant measuring instrument to the facilities of the quarantine station.

F The term “F” means the removal of the clothes of the connecting cable, and the removal of the clothes was carried out by tights into the connecting section of the instant measuring instrument and the electric circuit circuit circuit circuit circuit circuit circuit circuit circuit circuit circuit circuit circuit circuit circuit, and the instant measuring instrument or electric circuit circuit circuit circuit circuit circuit circuit circuit circuit circuit circuit circuit is installed, so there is little possibility that rainwater flows out even if it is rained.

E, in addition to the electric circuit circuit circuit breaker installed immediately below the instant measuring instrument, more than three electric circuit breakers were installed in the machine room, the quarantine plant, and the powder breaker.

On December 10, 2010, Defendant B had G qualified as an industrial engineer for electrical construction work performed a reinforcement work for electric facilities installed by E, and G installed new electric wires and electric circuit circuit circuit circuit installed by E.

C. On February 16, 201, H’s staff members of Korea War are the Disease Control Center of Korea.