(영문) 수원지방법원 2015.06.05 2013가합26701

건물명도등

Text

1. The Defendant-Counterclaim Plaintiff (Counterclaim Defendant) shall deliver each building and obstacles listed in the separate sheet to the Plaintiff (Counterclaim Defendant).

2...

Reasons

1. Basic facts

A. (1) The Plaintiff is a project implementer who has obtained authorization for the following implementation plan designated as a project implementer pursuant to the National Land Planning and Utilization Act for the E urban planning facility project in Suwon-si (the connected green areas referred to in subparagraphs 13, 14, and 15, hereinafter “instant project”).

(2) The Defendant is the owner of a steel structure, concrete roof building (one story 190 square meters, 2.3 square meters, 2.3 square meters, 253 square meters in total), and a steel structure, concrete roof building (one story 190 square meters, 2.3 square meters, 2.3 square meters in total, 253 square meters in total, 253.3 square meters in total, etc.), and a 88 square meters before I. (201, 2013) located within the instant project district, which are located within the area of the instant project, and a steel structure, concrete roof building (one story 190 square meters in total, 2.3 square meters in Suwon-gu, Suwon-si, Suwon-si, and H-si), and a 8 square meters before J (30 square meters in total, 2013) located on each of the said land.

(B) The above land (hereinafter referred to as “each of the instant land”), “the instant building,” “the instant land, etc.,” and “each of the instant land, etc.,” collectively.

(1) From around 2010, the Plaintiff and the Defendant agreed with the Defendant to acquire each of the instant land necessary for the implementation of the instant project from around 2010, but did not easily reach an agreement on the amount of compensation depending on different opinions.

(2) On March 20, 2012, L in charge of the Plaintiff’s compensation work and the Defendant drafted a memorandum of performance (agreement) as described below.

(hereinafter referred to as “instant Implementation Note”). The following Signatories, in writing, shall sign and seal each other to assume all civil and criminal responsibilities, as well as to facilitate prompt compensation for the normal business activities of the Malaysia M, and to complete the construction of the E Urban Facilities, as follows:

1) Site: The area of the land adjacent to the land corresponding to the area to be incorporated into the urban facilities of the present site at the workplace (as for the N-owned land in C, the area of the land required by the defendant in BO must be compensated with the land.

provided, however, that urban facilities.