위약금
1. The plaintiff's claim is dismissed.
2. The costs of lawsuit shall be borne by the Plaintiff.
Basic Facts
On September 15, 2015, the Plaintiff entered into a contract with the Defendant for the supply of flowerss (hereinafter “instant contract”) that the Plaintiff would supply the entire quantity to the Plaintiff (1,400 km per 1,400 g, total amount of 7,00 g) produced by the Defendant.
2. finished products and raw materials.
A. The defendant does not combine the flowers of finished products with domestic refined salt, and the defendant will supply them to the plaintiff.
B. The defendant shall use a raw material as a Australian sun-dried salt.
(90%) c.
The defendant is absolutely prohibited from selling finished products mixed with domestic refining costs.
4. Packing;
A. The plaintiff is to supply the packaging paper to the defendant.
5. Contract term and extension;
B. The plaintiff and the defendant can not unilaterally reverse the contract during the contract period.
6. Excess and shortage of production of fireworks;
A. If the Plaintiff becomes an overproduction during the sale of fireworks, the Plaintiff may demand the Defendant to suspend the production and reduce the production.
B. Although the Plaintiff demanded the suspension of production and the reduction of production, the Defendant may be deemed a breach of contract and claim damages.
G. The defendant shall not extend at will.
8. Prices for transported and products;
A. The defendant shall have 500 won per 1kg price at the arrival of the fireworks.
B. The defendant cannot transport and sell at will.
9. Prices of packaging units;
(a) the arrival per ton, 15 km, 10 km = 1 500 won;
(b) Small packages 3 km x 7 =13,50 won, 1 km x 20 =14,500 won;
12. A contract shall be entered into for five slicks in the daily production of the 1studs (unit km) daily production of the sluds (unit kmg) daily production of the sluds (unit 30 days) daily production (unit kg) with the 1.4t 5 p.m., 700 g. 17500 g. daily production of the sluds;
13. Amount of insufficient production.
A. In the event that the Plaintiff and the Defendant fall short of the output under the agreement as prescribed in Article 12, the Defendant shall give sufficient explanation to the Plaintiff regarding the shortage.
B. The defendant is in the production process.