(영문) 의정부지방법원 고양지원 2018.05.25 2016가단28432

부당이득금 반환

Text

1. The Defendant: (a) KRW 292,00 for the Plaintiff, and 5% per annum from February 22, 2018 to May 25, 2018; and (b) for the Plaintiff.

Reasons

1. Fact-finding;

A. Since August 23, 2004, the land of this case was owned by the Plaintiff. The Defendant installed and occupied the water supply and drainage facilities (hereinafter “instant water supply and drainage facilities”) under the ground as follows.

① From April 22, 2011, on the underground surface of the Section (a), (b), (c), and (d) of the attached appraisal map, the water supply pipes and the Section (e) laid the water supply log. Of them, the area of the Section (a) is 1.63m2, the area of the Section (b) is 4.18m2, the area of the Section (c) is 0.17m2, the area of the Section (d) is 0.17m2, the area of the Section (d) is 11.36m2,

(상수도 시설 전체 면적 합계는 19.59㎡). ② 2014. 7. 14.부터 별지 감정도 표시 ⓕ부분 지하에 오수관, ⓖ부분 지하에 오수 맨홀을 매설하였는데, 그중 ⓕ부분 면적은 1.65㎡, ⓖ부분 면적은 0.5㎡이다

(the total area of sewerage facilities shall be 2.15 square meters). (b)

The rent for using the portion of the instant land from April 22, 201 (the date of installation of waterworks facilities) to 2.15 square meters (the area of sewerage facilities) with respect to the underground part of 19.59 square meters (the date of installation of waterworks facilities) among the instant land, from July 14, 2014 (the date of installation of sewerage facilities) to February 21, 2018, respectively, is 292,000 won in total, and the rent thereafter with respect to the total of 21.74 square meters of underground area is 48,000 won per annum.

[Reasons for Recognition] Facts without a partial dispute, the entries and images of Gap evidence Nos. 1, 3, 4, and 6, the result of the measurement and the evaluation of rent, the purport of the whole pleadings

2. Determination

가. 임료 상당 부당이득 반환에 관하여 위 인정사실에 의하면, 피고는 이 사건 토지 중 ⓐ 내지 ⓖ부분 합계 면적 21.74㎡ 지하에 이 사건 상하수도 시설을 설치하여 그 부분 토지를 점유하고 있고, 달리 점유할 권원을 증명하지 못하는 이상 소유자인 원고에 대하여 그 점유로 인한 부당이득을 반환할 의무가 있다.

Therefore, the defendant is to install the water supply and drainage facilities of this case to the plaintiff.