beta
(영문) 수원지방법원 성남지원 2018.02.06 2015가합2573

손해배상(기) 등

Text

1. As to the Defendant (Counterclaim Plaintiff):

A. From August 1, 2006 to June 3, 2015, Plaintiff (Counterclaim Defendant) Co., Ltd.

Reasons

A principal lawsuit and a counterclaim shall be deemed simultaneously.

1.Basics

A. The Defendant is an organization consisting of sectional owners for the operation and management of the officetel in Seongbuk-gu, Sungnam-si (hereinafter “instant building”).

B. On May 14, 2004, F Co., Ltd. (hereinafter “F”) acquired and operated a sports center by acquiring G heading (hereinafter “H”) from among the instant buildings (hereinafter “H”), I, J, K, L, M, N,O, P and P.

The defendant created a family unit called Qho on the sports center part of the above sports center and imposed management expenses.

Since then, on December 8, 2011, R Co., Ltd. (hereinafter referred to as “R”) was divided into I and J on November 2, 2012 following the acquisition of Ghohos, I, Jhos, Hhos, K, M, and P from the voluntary auction among the above subparagraphs.

The status of changes in ownership and division in heading I and J shall be as follows:

On December 27, 2012, the acquisition of ownership on July 21, 2006 of the acquisition of ownership on May 14, 2004, < Amended by Act No. 11374, Dec. 27, 2012; Act No. 11373, Dec. 27, 2011; Act No. 11554, Dec. 14, 2004; Act No. 11554, Dec. 1, 2011; Act No. 11541, Mar. 5, 2011; Act No. 11787, Mar. 5, 2011; Act No. 110144, Mar. 1, 2011; Act No. 17177, Mar. 5, 2011; Act

C. R changed the heating and cooling method by dividing the above I and J.

Before the change, the air conditioning method was a method of compulsory air conditioning the air conditioning to each lake due to the operation of absorption equipment, and the air conditioning method could not control air conditioning in individual lakes by the method of compulsory air conditioning the greenhouse gas produced by the heat exchanger to each lake.

However, after the alteration, the air conditioners installed in the machinery room are supplied to each lake through the circulp, but each officetel of this case can regulate the air conditioners using the air conditioners, and can impose individual air conditioners for each household by measuring the quantity of use through the air conditioners.

Moreover, after the change.