도로점용허가거부처분취소
1. The instant lawsuit shall be dismissed.
2. The costs of lawsuit shall be borne by the Plaintiff.
Details of the disposition
The plaintiff is the head of the planning group of the first time B Festival (hereinafter referred to as the "instant festival").
On August 24, 2017, the Plaintiff reported the assembly to the Shipping Police Station on the date and time, “C08:0-18:00,” and the place of the assembly (the course of the demonstration and progress), “Gu-nam Cultural Square (Assembly)” and “Dongnam-dong Yae-dong Yaeong-dong Yae-Jon-Jon-Jon-Jon-Jon-Jon-Jon-Jon-Jon-Jon-Jon
On August 29, 2017, the Plaintiff filed an application for permission to occupy and use a road with the Defendant for the purpose of occupation and use as “B stable outdoor stage and secondary room for progress,” “place and size of occupation and use: 3,206m2, 3,206m2, 3,206m2, 3,206m2, 3,206m2, 3, 3, and 58
On September 1, 2017, the Defendant issued a non-permission on the ground that “C, which applied for permission to occupy and use a road with a thickness, was subject to prior permission to occupy and use a road due to an Arabic market and a bus stop performance, and thus it is impossible to grant overlapping permission.”
On September 7, 2017, the Plaintiff filed an application again with the Defendant for permission to occupy and use the road by changing the area of “the place and area of occupation: 1332, 1302, 2302, 342-1, 541-24, 541-24, 548-9, 549-2, 649-2, 77.5 square meters in sections 1,87.5 square meters in sections to the south of the 656-dong, Busan High-dong, 77.5 square meters in sections of the road (hereinafter “the road”).
이에 대해 피고는 2017. 9. 13. ‘㈎ 귀하의 B축제 진행용 야외무대 및 부스 설치를 위한 우동 541-24외 5필지의 도로점용 허가신청 건에 대해서는 구남로의 일부 구간에 타 행사(아트 마켓 및 버스킹 공연)가 예정되어 있고, ㈏ 반대 집회가 예정된 상황에서 무대 설치 및 홍보부스 등의 시설물 설치를 통한 행사 진행시 도로를 이용하는 다수의 이용객들의 불편 및 도로의 기능 유지, 공공질서 유지에 어려움이 예상되어 도로점용허가는 어려움’이 있다는...