beta
(영문) 창원지방법원마산지원 2016.06.15 2015가단4149

건물철거

Text

1. The Defendant indicated the Plaintiff on the attached Form 1 and indicated on the attached Form 1, among the buildings listed in the attached list, the land size of 132 square meters in Changwon-si, Changwon-si.

Reasons

1. Facts of recognition;

A. On January 16, 2012, the Plaintiff completed the registration of ownership transfer with respect to the Mamban-gu, Changwon-si, Changwon-si C large 132 square meters (hereinafter “instant land”).

B. On September 22, 2011, the Defendant completed the registration of ownership transfer with respect to the buildings listed in the separate sheet (hereinafter “instant building”).

C. Part of the outer wall abutting on the ground among the instant building is installed on the ground surface of the part (i) in the ship (hereinafter “instant part”) which connects each point of the instant land, among the instant land, with the indication of 1, 2, 3, 4, 5, and 1 in sequence.

[Reasons for Recognition] A without dispute, each entry and video of Gap evidence 1 through 5 (including virtual numbers), the result of the appraisal commission to the Korea Land Information Corporation and the purport of the whole pleadings of this court

2. If so, the defendant is obligated to remove the part of the building (part of the signboard and outer wall, etc.) installed on the ground of the part on the ground among the building in this case among the building in this case, which is the owner of the land in this case, and deliver the part on the land in this case, so the plaintiff's claim is justified and it is so decided as per Disposition.