사해행위취소
1. The assignment contract entered into on January 3, 2017 between the Defendant and C with respect to the claims specified in attached Form 1.
1. Basic facts
A. The Plaintiff (i.e., withdrawal; hereinafter “Plaintiff”) entered into a credit transaction agreement, etc. with C Co., Ltd. (hereinafter “C”) as listed below (hereinafter “each of the instant loans”); and (ii) on October 25, 2017 as of October 25, 2017, the sum of the principal and interest of loans as of October 25, 2017 (i.e., principal and interest of KRW 3,742,93,602, interest of KRW 435,987,145).
Serial 6. Loans of 0.40, 70, 70.40, 70.40, 70.40, 70.40, 70, 70.40, 70, 700, 700, 800, 700, 800, 205, 200, 208, 204, 60, 208, 60, 60, 60, 60, 200, 60, 208, 200, 200, 206, 60, 60, 60, 60, 100, 200, 200, 200, 200, 200, 200, 200, 300, 200, 304, 304, 200
B. C entered into a construction project contract with D Co., Ltd. (hereinafter “D”) on the beginning of the beginning of 2016 as a basic contract for construction works and its individual contract.
C. From June 2016 to December 2016, the Defendant received an order for the supply of automatic control systems equivalent to KRW 232,325,500 (including value-added tax) in total eight times from C and supplied each of them.
1 C is against the Defendant and the Defendant on January 3, 2017.
subsection (b).