beta
(영문) 수원지방법원 2014.09.25 2013가합5704

손해배상(건)

Text

1. Defendant C Co., Ltd.:

A. As to KRW 129,084,400 among the Plaintiff Company A and KRW 47,520,000 among them, the Plaintiff Company A shall be subject to the disposition on September 2, 2012.

Reasons

(b)the progress of construction has become impossible because of a delay in construction for any reason;

3. Where the commencement of construction has been delayed or suspended due to causes attributable to Party A;

4. Other conditions attached to the standard contract for private construction works where such works are delayed due to any cause not attributable to B.

1.B shall require the construction of this project to be performed in accordance with the estimates on the basis of the design drawings, and other accessories not indicated in the design drawings and estimates shall be included in the contract amount.

8. The books of the third books of the building shall be doored by a blick door, and the door inside the building shall be put in heat so that the door may be cut short;

9. After the completion inspection, connecting the building B and the building A 3 of the plaintiff B shall be carried out.

(B) The roof: Salking and king connection). The Agreement on Private Construction Works

6.B shall be responsible for and undertake all the works for civil and construction works on the present land taken over by the Land Corporation.

(ApHC 0400m/m*8m) The file 8. The additional cost shall be borne by A when the ground enters more depth than 8m in the file length, and the additional cost shall be borne by A.

(1) Standard form contract for private construction works (1) : Plaintiff B’s construction site (109.03m2: 109m2: 1/100) : The construction period: F (3) : the starting date - the completion of February 27, 2012 - the contract amount of 704,000,000 won (including value added tax): the value of value of 640,000,000 value of value of value of value of 64,000,000 value of value of value of value of value of 64,00,000,000 (8) : the standard form contract for private construction works with the Plaintiff except for the case where “A” is referred to as “B” under the general terms of the standard form contract for private construction works with the Plaintiff

1.B shall require the construction of this project to be performed in accordance with the estimates on the basis of the design drawings, and other accessories not indicated in the design drawings and estimates shall be included in the contract amount.

4. The connecting construction work of the plaintiff B and the plaintiff A's building 3 shall be carried out after the completion inspection.

Roofs: Sshackra and.