beta
(영문) 대구고등법원 2019.11.21 2018나25848

물품대금

Text

1. Of the judgment of the court of first instance, the part against the Plaintiff corresponding to the following additional payment order shall be revoked.

Reasons

1. Special conditions of a contract for the production, replacement, and processing of aggregate based on the facts;

1. On-site name of a production site summary: The name of a type of work at the old and US C site: The production and sale period of aggregate: The location of the site from July, 2014 to June, 2018: the old and US D;

2. General support items 1) The terms and conditions of the authorization and permission (except for basic civil works, etc. at the time of construction of machinery) (2) the production of aggregate and all other matters of authorization and permission (such as permission for piling up aggregate, reporting on crushing out aggregate, reporting on dust scattering, reporting on emission of wastewater, reporting on noise and vibration, etc.) shall be made administratively handled by the defendant. (3) The environmental management defendant shall install soundproof and dust-proof walls to prevent scattering and noise and vibration, install automatic studios at the static door, and operate one studios regularly at the static door. (4) The transformation facilities for power generation in the substation/P site are installed by the defendant with a capacity suitable for production, and the expenses for the designation of an electrical safety management company shall be borne by the plaintiff. (5) The Plaintiff shall pay rent for the installation and installation of aggregate at the time of loading and unloading aggregate to the C/P distribution team, the period of the above installation and installation of aggregate at the time of loading and removal of tin to 2 tin.

3. Environment management of 3 production management.