[Defendant A] The defendant shall be punished by imprisonment with prison labor for ten months.

The defendant shall be 50,000,000 won by fraud to the applicant for compensation.

Reasons

Punishment of the crime

1. The Defendant: (a) recommended the victim D, who was introduced through spring G around 2014, to purchase a vehicle owned by the Defendant for the development of the e-mail and to conduct the e-mail project, on the ground that “the sale of KRW 60,000,000,000 shall take place per year from the first generation vehicle,” while operating F under the name of the spouse of E, the e-mail company.

On May 2014, the Defendant sold one h. 3.5 tons truck owned by the Defendant, which was altered to a lane developed by the victim, in the amount of KRW 50 million, the Defendant would allow the victim to participate in an event that can be punished by KRW 35 million for a year.

If a person retires from office after two years, 3.5 tons of power generation will be renewed to 50 million won.

“The Agreement was made.”

A. On May 23, 2014 to October 30, 2014, the Defendant involved in the production cost-related fraud, which alters I 4.5 tons of trucks from the point of development, introduced the victim into the J Cont, etc. three times to enable the victim to perform his/her work. On May 30, 2014, the victim at the L festival located in Sejong K, “two developing vehicles are needed to develop into J-to-Korean contact.”

The time of production can also be reduced from 45 days to 30 days, and when the power generation vehicle is added to one another, the net income of KRW 1,500 to 20 million can be raised.

It is proposed that the three-time performance can be directly given.

We have 4.5 tons of heavy-sized trucks with 50 million won and 50 million won, and the cost of manufacturing is added to 7-80 million won to 7-80 million won.

When using a secondhand collateral loan, manufacturing costs may be prepared.

E shall be returned upon the receipt of a refund of value-added tax when a person purchases a heavy vehicle with 1% equity interest.

“.......”

However, on May 2014, the Defendant would produce a power generation vehicle with a total of KRW 50 million, including KRW 30 million for power generation, and production costs including materials and public services, between the operator N of “M” (M) operator around the end of the period, and KRW 20 million.