beta
(영문) 수원지방법원 2017.01.12 2015고정3012

수질및수생태계보전에관한법률위반

Text

Defendants shall be punished by a fine of KRW 2,000,000.

Defendant

If A does not pay the above fine, it shall be 100.

Reasons

Punishment of the crime

Defendant

A is the representative director of the defendant B corporation established for the purpose of the steel wholesale retail business, steel structure, miscellaneous steel manufacturing business, etc. in the ethrified City.

1. Persons who intend to install Defendant A wastewater discharge facilities shall report to the Minister of Environment as prescribed by Presidential Decree;

From around 2005 to August 13, 2015, the Defendant installed a cutting and drying machine (2 0.041 cubic meters from 0.041 cubic meters, 0.098 cubic meters), which is a wastewater discharging facility, and operated the facility using the cutting and dying machine (1st metres from 0.041 cubic meters).

2. Defendant B Co., Ltd. committed a violation against Defendant B, who is the representative director of the Defendant, at the same time and place as the above paragraph 1.

Summary of Evidence

1. The Defendants’ respective legal statements

1. A written accusation;

1. A letter of business trip;

1. On-site photographs;

1. Application of Acts and subordinate statutes for factual inquiries and replies;

1. Defendant A: Article 76 Subparag. 2 and Article 33(1) of the Water Quality and A of the Act on the Conservation of Water Quality and Living Conditions; Article 81, Article 76 Subparag. 2 and Article 33(1) of the Act on the Conservation of Water Quality and Living Conditions; Article 81 of the Water Quality and Living Conditions Conservation Act; Article 86 Subparag. 2 and Article 33(1) of the Act on the Conservation of Water Quality and Living Conditions;

1. Defendant A who is detained in a workhouse: Articles 70 (1) and 69 (2) of the Criminal Act;

1. Defendants of the provisional payment order: Determination on the allegations by the Defendants and their defense counsel under Article 334(1) of the Criminal Procedure Act

1. The summary of the argument is as follows: (a) cutting the sn beam beam recorded in the instant workplace in compliance with the order of the business partner or drilling the hole; (b) inspecting and supplying the defective products (the supply of inspection products by suffering materials, such as the sn beam beam (H beam)); (c) processing process using a cuter and snick machine, which is the instant facilities, is the processing process; and (d) cutting and cutting the sn beam mixed with water 0.38 cubic meters in cubic meters (which is used to reduce strings and to generate waste generated at the time of processing).