구상금 등 청구의소
1. As to KRW 186,318,531 among the Plaintiff and KRW 29,85,442 among the Plaintiff, the Defendant shall pay KRW 20,00,000 from July 6, 2019.
1. Facts of recognition;
A. Nonparty C owns 330 square meters and 53.75 square meters and 53.75 square meters and fluories of light steel bars and sand position gluor in Sig City D’s city.
B. C on March 5, 2018, leased 230 square meters inside the building to the Defendant.
The defendant operated a furniture factory in the leased part.
C. On April 3, 2019, C leased the front 165 square meters of the building to Nonparty E.
The Plaintiff entered into an insurance contract for “F” with respect to the foregoing building between C and C.
F Securities No. G contractor/insured C/ H insurance period from June 19, 2018 to June 19, 2021, the amount of insurance coverage covered by the secured subject matter of Gyeonggi-do, the Gyeonggi-do, the location of the insured, is KRW 120,000,000.
E. (1) The Plaintiff entered into an insurance contract with E with respect to the leased parts of the building, machinery, facilities, fixtures, etc.
The name of insurance products i.e., the H insurance coverage period from January 21, 2016 to January 21, 2021, 2021 at the time of Gyeonggi-do, where the policyholder/insured E, the insurance company entered into an insurance contract with respect to fire damage [building (non-building)] KRW 100,000,000 mechanical fire damage [mechanic] KRW 15,000,000,00 fire damage [facilities (non-building] 15,000,000 collective fire damage [unit fire damage] 15,00,000,000 movable property damage [property (non-property] 20,000,000, and the Plaintiff entered into an insurance contract with E-learning as to machinery and equipment damage.
The name of the insurance product L policyholders/insured E-type H insurance period from July 27, 2018 to July 27, 2021, the amount of insurance coverage of the secured subject matter from July 27, 2018 to July 27, 2021, fire damage [mechanic] 131,00,000 won
F. On June 8, 2019, a fire occurred in the leased premises of the Defendant’s building around 21:30.
(g) Contents of the comprehensive report on fire investigation in the Si interest fire station are as follows:
VII Decision on the Points of Origin
1. Determination of CCTV points: The end of the factory operation, which confirms CCTV installed in an adjacent vinyl house, shall be B.