구상금
1. Defendant A’s KRW 195,911,692 for the Plaintiff and KRW 5% per annum from September 26, 2015 to June 7, 2017.
1. Basic facts
A. The Plaintiff is exempt from the entry of “stock company” in the name of the company B (hereinafter “stock company”) on or around June 2014.
2) As between B and B, the steel framed C’s framed C’s ductal ducts factory of one story plastic ducts (hereinafter referred to as “instant B factory”).
(3) As to each fire insurance contract, each fire insurance contract (hereinafter “instant No. 1 Insurance”) with the following contents as follows, and the instant No. 2 Insurance
(1) Insurance types of insurance of this case: D policyholder B: insurance period: From June 26, 2014 to June 16, 2015, the subject matter/insurance amount: 120,000 - 30,000 - 15,000 facilities - 00,000 - 50,000 - 50,000 - 50,000 - 50,000 - 250,000 - 50,000 m20,00 m20,000 - 20,000 m20,00 m20,00 m20,00 m20,00 m20,00 m20,00 m2,000 m2,00 m2,00 m2,00 m26,00,00 m26,264, respectively.