디자인 용역대금
1. The Defendant shall pay to the Plaintiff KRW 29,50,000 as well as 20% per annum from January 3, 2015 to the day of complete payment.
1. Basic facts
A. On February 1, 2013, the Plaintiff entered into a contract with the Defendant for the design service of Pyeongtaek-si B (hereinafter referred to as “instant database”) at the time of completion of the outsourcing work (value-added tax separate), from February 1, 2013, the details of the service and the method of payment of the service cost, and the details of the service and the method of payment are determined to be based on the separate order for work. The main contents of the order for work are as follows:
(hereinafter referred to as the “instant service” and the “instant service contract” are referred to as the “instant service contract”). TPP 1: Concept establishment and review
1. Establishment of Concep and January 1, 200 - January 31, 200 - Ordinance of the Ministry of Strategy and Finance - Consultation on the direction of Study
2.Preparation of the contract / The first week in February of this model commencement - the fourth week in February - the fourth week: the fourth week in the fourth week in the entry according to the flat arrangement - The first down payment in the cubic area plan ID and the first down payment in the old plan: 30,000,000 / February 1, 200: the development of the concept of entry.
3. The first week of March of the development of design - the second week of March - the second week of March: Development of the program - Designation of material for the master plan - The first interim payment of the first interim flag of the production of basic slots and the development of the draft body: 20,000,000 won/day of March 29.
4. The second generation of design and the fourth week in April, 190 - the fourth week in May: the final supply - the consultation on design and traffic / the consultation on the interior interior design and the unit cost of construction - the middle payment for the last delivery to the owner of the design design: 20,000,000 won/ the payment date / the design supervision 3: design supervision on May 31.
5. Work progress - The work completion time: - The work completion time (e.g., the work completion time) - Review of and alteration to a design proposal at the request of the site - the final payment of design supervision and materials consultation: 25,000,000 won/ the completion time of the outside work.
B. In accordance with the instant service contract, the Plaintiff’s image as an alternative master plan, image of an outer design opening, and related construction work for the Defendant.