beta
(영문) 울산지방법원 2014.02.06 2013고단3192

사기등

Text

A defendant shall be punished by imprisonment for not more than ten months.

Reasons

Punishment of the crime

The judgment of the court of Ulsan District Court rendered on September 13, 2006, 8 months of imprisonment with prison labor for larceny and 2 years of suspended execution, which became final and conclusive on September 21, 2006. On December 8, 2006, the above court sentenced 6 months of imprisonment with prison labor for larceny and 2 years of suspended execution, which became final and conclusive on December 16, 2006. On September 19, 2007, the above court sentenced 8 months of imprisonment with prison labor for larceny and September 28, 2007, which became final and conclusive on September 28, 2007, and the sentence of each of the above suspended execution becomes null and void, and the period of parole passed on October 28, 2008 of each of the above suspended sentence.

【Criminal Facts】

The Defendant, around 11:00 on March 31, 201, concluded that “E” for the victim’s D operation located in Ulsan-gu Seoul-gu, Ulsan-gu, “The Defendant works to install steel structures on the side of the outside Dong, but the materials need to be leased.”

However, in fact, the Defendant did not engage in the installation of steel structures in the outer Dong. Moreover, at the time, the Defendant was trying to immediately sell materials delivered from the victim due to labor costs and material costs that were not paid properly while remodeling apartment units at the time, and to pay the above labor costs and material costs.

The Defendant, as such, by deceiving the victim and receiving 3.3 million won in the market value on the same day from the victim, was delivered with iron materials equivalent to KRW 29,850,000 in total from around that day to April 13:00, as shown in the separate crime list, as shown in the victim D and F, from around nine times in total.

around April 28, 2011, the Defendant: (a) at the I office operated by the victim H in Ulsan-gun G in Ulsan-gun on April 28, 201; (b) 6m pipe 150; (c) 200; (d) 3m pipe 200; and (e) 8.5 million won in total from the victim.