beta
(영문) 전주지방법원 군산지원 2018.10.30 2018가단52844

손해배상(기)

Text

1. The Defendants jointly share KRW 78,723,450 with respect to the Plaintiff and the period from April 21, 2016 to October 30, 2018.

Reasons

Defendant B (hereinafter “Defendant B”) was the contractor of D New Construction on January 27, 2016, and the part of D New Construction Co., Ltd. (hereinafter “instant construction”). Defendant C Co., Ltd (hereinafter “Defendant C”) subcontracted the instant construction work to E during the said construction work. Defendant C Co., Ltd. (hereinafter “Defendant C”) re-purchaseed and re-contracted the instant construction work via E and F.

The Plaintiff, as an employee of the Defendant limited liability company C, was placed in the instant construction, and was engaged in the construction of the structure by assembling a steel frame with a height of about 10 meters above that of the steel frame at the construction site of the instant construction site located in Jung-gu, Jung-si on April 20, 2016, and was engaged in the construction of the structure, the Plaintiff was killed on the floor by using the steel frame, which was dried up on the ground, at the price of the steel frame filled up by the Plaintiff. Accordingly, the Plaintiff suffered injury, such as the pelle and the real name of the pellet, etc.

(hereinafter “instant accident”. Criminal punishment: (a) Defendant B’s field commander, as a person in charge of safety and health management who exercises overall control over the tasks of direction, safety management, supervision, etc. of the instant construction site; (b) without preparing a work plan for handling heavy objects, including safety measures to prevent workers’ danger, such as collapse risk, electric intensity risk, fall risk, etc.; and (c) in the event the steel frame is not permanently fixed, he was aware of the fact that there is a fall risk to workers; and (d) in the event that the steel frame is not permanently fixed, he should designate a signal number and give a signal by setting a certain signal method; and (b) install a temporary support pole or support pole to prevent any gap between the steel pole and the ground; and (c) protect workers from using the steel pole.