(영문) 제주지방법원 2019.01.08 2017가단61555

토지

Text

1. Of the land size of 2,673 square meters in Seopopopopo City C forest land 2,673 square meters, the Defendant indicated in the annexed drawing No. 7-17, 33, 32, 31, 30, 29, 28, 27, 26, 25, and 25.

Reasons

1. Facts of recognition;

A. On July 30, 1998, the ownership transfer registration was completed on July 30, 1998 by one half of the shares in E and F, and on April 10, 200, the F was the sole ownership, and again on February 2, 2001, the ownership transfer registration was completed on the share of 992/66.

After that, on February 27, 2002, the above land was divided into 6024 square meters prior to D, 1250 square meters prior to H and 992 square meters prior to I.

D) On March 28, 2002, the previous 6024 square meters was owned by F, and was divided into 969 square meters prior to D on October 23, 2002 (hereinafter “the instant land”), 4425 square meters prior to J, 420 square meters prior to K, and 210 square meters prior to K. On August 27, 2004, the 4425 square meters prior to J was further divided into 2246 square meters prior to J (hereinafter “the instant land 2”), 145 square meters prior to M, and 724 square meters prior to N24 square meters.

The Plaintiff, on March 19, 2008, donated the instant land Nos. 1 and 2 from F, and completed the registration of ownership transfer on March 24, 2008.

B. Around December 15, 2005, P farm site: (a) around December 15, 2005, P farm site was divided into 3581 square meters and Q farm site into 378 square meters; (b) around December 10, 2008, P farm site was converted into 3352 square meters and around April 8, 2015; (c) around April 8, 2015, the area was 4668 square meters by combining 1316 square meters and the area was divided into 2673 square meters and 195 square meters; and (d) C sports site was changed into 2673 square meters and 2673 square meters on February 6, 2017 (hereinafter “instant land category”).

The Defendant purchased the instant passage land on March 25, 2015 and completed the registration of ownership transfer on April 1, 2015.

C. On the ground of the instant land No. 1, an inspection consisting of 240.74 square meters of the building area of 240.74 square meters of the building area of 240.74 square meters on the ground of the instant land without permission from the competent authority on April 1973 (hereinafter “instant inspection”). The Plaintiff is the representative of the instant inspection registered with U on December 19, 2003.

The land of this case, which the plaintiff had been cement packaging, is a contribution from the inspection of this case to V roads.