1. As to Plaintiff A’s KRW 53,39,849, and KRW 2,00,000 to Plaintiff B and each of the said money, the Defendant shall start from August 1, 2013 to August 2016.

Reasons

1. Basic facts

A. The defendant is an intention to operate the "E Hospital" in Gangnam-gu Seoul Metropolitan Government (hereinafter referred to as the "E Hospital"), and the plaintiff A is a person who has received a nuclear removal from the defendant Council member, and the plaintiff B is the plaintiff's spouse.

B. On July 25, 2013, the Plaintiff’s member of the Defendant Council (1) was provided with medical treatment on July 25, 2013 due to the symptoms consisting of the cryptian and the left-hand side, and the Plaintiff was solicited to provide hydro-nuclear removal surgery using the cryptian. 2) On August 1, 2013, the Plaintiff was hospitalized in the Defendant Council and conducted the MaRI (self-official image) test on August 1, 2013 due to the continuous symptoms, and was diagnosed with the cryptian escape No. 5-T, No. 13 from 16:13 to 20:17 from 16:17 of the same day.

Febrates have been built of vertebrates.

b) removal of sculptures. The outer vertebrate disc approached with the stude, but the stude was so severe that they could not be seen, and almost little. One of the brates, the brates of rice, and two of the two removals of galleites of rice.

More than anything else, the Defendant’s records on the instant surgery at the time of the instant surgery is as follows, because it is anticipated that the instant surgery would be damaged.

3. On August 2, 2013, Plaintiff A complained of the pain of the operation department and the fall from the left side to the end of the operation, and Plaintiff A complained of the pain of the left side bridge, the pain of the mali, the fall of the marith, the fall of the marith, and the fall of the left side symptoms.

The medical personnel of the Defendant Council conducted the RoI test to the Plaintiff A and administered a performance control.

As a result of the MRI's inspection, the nuclear escape from the left side of the ebrate No. 5-astronomical calendar No. 1 was removed, but it was confirmed that the ebrate escape from the left side of the ebrates led to the left side and pressure of the ebrate No. 1.

(c).