1. Basic facts

A. (1) The Plaintiff is a company established for the purpose of electrical construction business, etc., and the Plaintiff shall be a company established for the purpose of the electric construction business, etc., and in December 2012, the New Airport Co., Ltd. (hereinafter referred to as “New Airport

3) The factory in the 132-9 of the Dog-ri, the Dog-ri, the Dog-dong, the Nanannam-gun, the operation of which is

(2) A construction contract was concluded with the purport that the construction of electric facilities is to be executed. (2) The Plaintiff was supplied with water distribution team equipment and subdivisions necessary for the said construction from Han Electric Co., Ltd. (hereinafter “One Electricity”). The aforementioned water distribution team equipment and distribution unit were manufactured by the Defendant and supplied through the same credit rating company (hereinafter “first transformers”).

3) On December 28, 2012, the first voltage is the first floor electric room of the first floor (hereinafter “instant electric room”) upon arrival in the said factory in packaging.

(1) On February 20, 2013, the Newancheon, Inc., was established in the instant plant, and was issued by the Korea Electrical Safety Corporation a certificate of pre-use inspection with respect to electric facilities of the instant plant, including the first voltage. However, on February 22, 2013, the Newancheon, Inc., who tests the said electric facilities, was in the presence of its employees, etc., during the process of the testing the said facilities (hereinafter “the first accident”).

(4) The Defendant sent an employee A to the above factory on the following day, and drafted a letter to the Plaintiff that he/she would install a new voltage at the above factory by March 7, 2013. Accordingly, on March 7, 2013, the Defendant re-established the transformers that he/she manufactured at the above factory (hereinafter referred to as "second voltages"; hereinafter collectively referred to as "each side voltages") at the above factory on March 7, 2013.

B. (1) However, on March 25, 2013, the 2nd voltages also explosiond around 11:30 on the operation (hereinafter “the 2nd accident”) (hereinafter “the 2nd accident”), and the 2nd accident collectively referred to as “each of the instant accidents”.

Accordingly, the factory of this case.